A straight swap of the toilet suite plus minor cosmetic work can often be done in just a few days. A full toilet renovation with new tiling, plumbing corrections, and ventilation upgrades usually runs closer to a week. The main variables are access, age of the plumbing, and how much structural work we have to undo from past “handyman fixes.”
Yes. We can isolate the toilet zone, even if it sits inside a combined bathroom. We plan protection, isolate dust, and control water shut-offs so you’re not without a shower the whole time. If you’re not ready for a full bathroom renovation yet, we won’t force it.
Short answer: we fix it properly, not cosmetically. A rocking pan, a cracked collar, or slow leaks into the subfloor are red flags. If we find that during demolition, we’ll show you exactly what’s happening, explain the repair, and price it transparently before touching anything further. That way you know you’re not being upsold; you’re preventing future damage.